OPTIMALISASI HIBRIDPLTS PLN PADAWAKTU BEBAN PUNCAK

Penulis

  • Bakhtiar Bakhtiar
  • Tadjuddin Tadjuddin

Abstrak

The peak load is due to the electric power consumption in Indonesia in general is the dominance of householdcustomers, who at the same time use electricity for lighting, watching TV, the use of air conditioning, cooking and otheractivities. From the daily load curve of PT. PLN shows a large trend of difference between the lowest load and the peakphase, meaning that at certain hours or outside the peak load time the plant is not operating and when peak load isoperated. Therefore, investment cost is needed for the provision of power plant only to serve the peak load. To minimizethe use of electrical energy generated by PT. PLN at peak load time is needed replacement energy source, and in thisresearch is designed and implemented solar cell utilization to change source PT. PLN at peak load time for powerinstalled 900 VA. This research is a research development that has been done the previous year, that is the developmentof transfer control from PLN to PLTS at 17.00 and transfer from PLTS to PLN at 22.00 hours. The part that developedin this research is the source of supply for control using 2 source that is from PLN and PLTS, so that manual andautomatic control is not disturbed if one source off or disturb system. In addition to the development of controls alsodeveloped capacity PLTS system to be optimized its use at peak load time. By that it is necessary to use electricalenergy at peak load time, the measurement results for a week obtained 2800 Wh which is the highest usage and thisbecomes the basis for designing the PLTS to be used. The installed panel capacity can supply loads at peak load times of50.82% and the capacity of the electric storage battery can supply the load at the peak load time of 82.30%.

Referensi

Bakhtiar dkk. 2013. Rancang Bangun Sistem Hibrid Pembangkit Listrik Tenaga Surya (PLTS) dengan Pembangkit

Listrik Tenaga Bayu (PLTB) untuk Masyarakat Pegunungan. Laporan Penelitian Hibah Bersaing. Makassar:

Politeknik Negeri Ujung Pandang.

---------- . 2015. Rancang Bangun Pemanfaatan Solar Cell sebagai Sumber Energi Listrik pada Saat Beban Puncak PLN.

Prosiding Seminar Nasional Teknologi Industri III. Makassar: ATIM.

Chenni, R. et all. 2007. A Detailed Modeling Method for Photovoltaic Cells. Journal of Energy, Volume 32 (Issue 9):

pp 1724-1730.

Liem Ek Bien, Ishak Kasim dan Wahyu Wibowo. 2008. Perancangan Sistem Hibrid Pembangkit Listrik Tenaga Surya

dengan Jala-jala Listrik PLN untuk Rumah Perkotaan. JETri, Volume 8, (1) pp: 37-56.

Prastawa, Andhika. 2006. Penerapan Teknologi Photovoltaic Grid-Connected. Jakarta: BPPT.

Diterbitkan

2018-08-28

Terbitan

Bagian

ELEKTRO, KOMPUTER & JARINGAN, MEKATRONIKA, TELEKOMUNIKASI, DAN INFORMATION COMMUNICATION & TECHNOLOGY