ANALISIS HUBUNGAN FAKTOR-FAKTOR RISIKO TERHADAP KEBERHASILAN PROYEK KONSTRUKSI JALAN DIKABUPATEN MOROWALI UTARA

Authors

  • Herawati Abdul Hafid
  • Amar Amar
  • Nirmalawati Nirmalawati

Abstract

Every construction project is always faced with the possibility of various risks. The higher the complexity levelof a project the greater the level of risk borne by the construction project. These risks have a major impact on thesuccess of a construction project. However, there are no specific studies to explain how risk factors influence thesuccess of a construction project. This study aims to determine what risks have significant effect on the success of theproject by performing risk modeling and implementing the results of the risk-causing model of project success. Researchon risk factors for project success. The research on risk factors for the success of this construction project wasundertaken in North Morowali District by distributing questionnaires aimed at contractors, supervisors, consultants,commitment-making officers, who were seen directly in a road construction project. Furthermore, all the collectedquestionnaires were analyzed statistically by using Structural Equation Model (SEM) analysis. From the analysis it isfound that the risk factors that determine the success of a road construction project are: project success risk, humanresource risk, design risk, material risk, and equipment risk where construction risk affects the same value to the successof the construction project. However, the risk factor that influences the success of a construction project is the risk ofdesign.

References

Cahyo Kuncoro. 2015. Manajemen Resiko pada Proyek Konstruksi, Malang

Chan, A.P.C. 2001. Framework For Measuring Succes of Construction Project, School of Construction Manajement

and Property Queensland University of Tehnology Brisbane, Australia.

Clarkson H. Oglesby 1996. Teknik Jalan Raya, Jakarta: Erlangga

David Vose.2008 Risk Analysis A Quantative Guide, England : wiley

Damodara U. Kini. 1999. Material Management: The Key to Successful Project Management Journal of Management in

Engineering, January

Flanagan R Norman G. 1993. Risk Management and Contruction. Cambridge : University Press. Godfrey, P.S. 1996.

Control of Risk. A Guide to the Systematic Management of Risk from Construction. Westminster London :

CIRIA.

Hair, J.F, Jr,et.al. 1995. Multivariate Data Analiysis With Reading, 4rd edition, Prentice-Hall International Inc, New

Jersey

Hamirhan S. (2009), Struktur Konstruksi Jalan Raya buku 3, Bandung

Imam Suharto. 1999, Manajemen Proyek, Jakarta :Erlangga.

Irika Widyasanti dan Lenggogeni 2013 Manajemen Konstruksi. Bandung, Rosda

Malayu S.P. H. 2008 Manajemen Sumber Daya Manusia. Jakarta: Bumi Aksara

KK Chitkara. 1998. Construction Project Management,ICPM, India

Leksmono S P. 2016. Rekayasa Lalu Lintas Edisi 3. Jakarta: Indeks

Nancy Mingus. 2004. Projetc Management .Jakarta: Predana

Peraturan Pemerintah No. 26 Tahun 1985 tentang jalan

Proboyo, B. 1999. Keterlambatan Waktu Pelaksanaan Proyek : Klasifikasi Dan Peringkat Dari Penyebab Penyebabnya,

Dimensi Teknik Sipil, Vol. 1 no. 2, September.

Pusbin Magister Teknik Sipil UII. 2011. Pelatihan Analisis Statistik menggunakan SEM’ bahan ajar, Yogyakarta

Saqib, Faroqi, Sarosh. 2008. Assessment of Critical Success Factors for Contruction Project in Pakistan, Pakistan

Setiawan Mulyawan. 2015. Manajemen risiko. Bandung : Pustaka setia

Saputra, I G. N. Oka. 2005. Manajemen Risiko pada Pelaksanaan Pembangunan Denpasar Sewerage Development

Project (DSDP) di Denpasar (tesis). Denpasar :Universitas Udayana

Siswoyo Haryono dan Parwoto Wardoyo. 2009 Structural Equation Modeling, Jakarta.

Singgih Santoso. 2015 ‘Amos 22 untuk Structural Equation Modelling’ Penerbit PT Alex Media Komputindo, Jakarta

Sugiono. 2009, Metode Penelitian Kuantitatif dan Kualitatif dan R&D, edisi ke-6, Alfabeta, Bandung

Sugiono. 2013, Statistika dan Penelitian, edisi ke-23, Alfabeta, Bandung

Syafri Albajoe. 2016. Sejumlah Proyek Bermasalah, Morowali, Sulteng Raya

Undang-undang Republik Indonesia Nomor 38 Tahun 2004 tentang Jalan

Undang-undang Republik Indonesia Nomor 22 Tahun 2009 tentang Jalan

Widerman, Max, R.1992. Project And Program Risk Management: A Guide To Managing Project Risk Opportunities,

Amerika

Zainal Mustafa EQ dan Toni Wijaya. 2013, Panduan Teknik Statistik SEM dan PLS dengan SPSS AMOS, Jakarta

Downloads

Published

2018-08-28

Issue

Section

SIPIL & KEAIRAN, TRANSPORTASI, DAN MITIGASI BENCANA