Low investment in renewable energy can affect the sustainability of the national energy supply. Some of the obstacles
that cause low investment in renewable energy include the very high initial investment cost resulting in high and
uncompetitive renewable energy prices, private interest in the renewable energy sector that is still low and the ability of
domestic industrial technology is still low. Therefore, it needs an innovation from industry and university to design and
produce a renewable energy power plant that is adapted to the economic conditions and capabilities of the people who
need it. This activity is carried out by a team that has experience in the field of electric power generation, electric power
installation and product management and marketing.The design and production of solar power plants begins with box
design, installation design and component installation. The products made are 3 units of SHS-PNUP80, 3 units of SHSPNUP120
and 2 units of PLTS.T-PNUP300.