CATU DAYA CADANGAN PADA RUMAH IBADAH

Suryanto Suryanto, Sonong Sonong, Muhammad Ruswandi Djalal, Rudianto Said

Abstract


The reliability of electricity supply in a public building such as a mosque is very important to support routine
activities that are carried out periodically in it. The purpose of this activity is to design and install a generator
set along with the appropriate electrical installation in a mosque to improve the reliability of electricity supply
in the worship building. Community service activities consist of planning a generator set, electricity
installation and testing the system. The results of testing the generator set system, as a backup electric power,
show positive results in terms of the ability to supply electricity when the PLN electricity supply is cut off.
Likewise the system of diverting resources from PLN to the generator-set and vice versa takes place safely and
easily operated.


Full Text:

PDF

Refbacks

  • There are currently no refbacks.