Maneuver Protection of Feeder Lines at PT. Garuda Maintenance Facility Aeroasia Tbk.

Authors

  • Muh. Haris Haris Student
  • Wisna Saputri Alfira WS Politeknik Negeri Ujung Pandang
  • Kurniawati Naim Politeknik Negeri Ujung Pandang

DOI:

https://doi.org/10.31963/elekterika.v23i1.5578

Keywords:

Load Flow, Manuver, Relay Protection, TMS

Abstract

PT. Garuda Maintenance Facility (GMF) Aeroasia Tbk. abbreviated as PT. GMF Aeroasia Tbk., one of PT. PLN (Persero)'s business consumers located in the Soekarno Hatta airport area with a load contract of 7.5 MVA. PT. GMF Aeroasia Tbk. is supplied from two feeders, namely the Garuda 1 (main) and Garuda 2 (backup) feeders from the Cengkareng Substation (GI) through a 20 kV medium voltage distribution network. Based on data in 2023-2024, PT. PLN (Persero) ULP Teluk Naga, the feeder that supplies to PT. GMF Aeroasia Tbk. has experienced disruptions 2-3 times each year. This allows the protection equipment not to work properly which can reduce the reliability of the network. The purpose of this study is to obtain the results of protection coordination between the incoming side of the delivery line and the outgoing side of the substation transformer serving PT.GMF Aeroasia Tbk, and to obtain the incoming and outgoing protection setting values ​​on the substation and feeder transformers serving PT.GMF Aeroasia Tbk., through the calculation of relay setting values, simulation and analysis of coordination and maneuvering of the protection system against the outgoing side of the load and the outgoing side of the GI. The results of this study indicate that the setting value of the over current relay (OCR) protection on the outgoing side of the load I_set = 304 A, TMS = 0.13 s is greater than the setting value on the incoming side of the GI, namely I_set = 280.5 A, TMS = 0.1 s. Furthermore, the existing setting value of the OCR protection on the outgoing side of the load is 304 A and the setting value on the incoming side of the GI is 280.5 A, after resetting the OCR protection on the outgoing side of the load is 237.6 A, TMS 0.8 s and the setting value on the incoming side of the GI is 280.5 A TMS 1 s. The impact of the 20 kV system maneuver on relay protection coordination due to OCR disturbances on the incoming and outgoing sides still backing each other up on both feeder sides 1 and 2

References

Abdul Azis dan Irine Kartika Febrianti, 2019. Analisis Sistem Proteksi Arus Lebih Pada Saluran pengantar atau penyulang Cendana Gardu Induk Bungaran Palembang. Jurnal Ampere, Volume 4, No2.

[2] Adhitya Indrajaya Putra, dkk, 2017. Evaluasi Setting Relay Arus Lebih dan Setting Relay Gangguan Tanah Pada Gardu Induk 150KV Bawen.Semarang: Departemen Teknik Elektro Universitas Diponegoro. Online. Diakses 22 Juli 2024.https://ejournal3.undip.ac.id/index.php/transient/art icle/download/181 09/17158.

[3] Anderson, P.M, 1999. Power Sistem Protection. IEEE PRESS PEOWER ENGINEERING SERIES., New York. Online. (https://archive.org/details/POWERSISTEMPROTECTI ONP.M.Anderson/page/n1/mode/2up?view=theater), diakses 07 des 2023.

[4] Anang dan Adnan, 2017. Modul Pelatihan Etap. Yogyakarta.: Jurusan Pendidikan Teknik Elektro Fakultas Teknik Universitas Negeri Yogyakarta.

[5] Djoko Laras Budiyo Taruno, 2018.Unit Trainer Panel Kubikel 20 kV. Yogyakarta: Jurusan Pendidikan Teknik Elektro Universitas Yogyakarta. Online. Diakses 19 Desember 2023. https://staffnew.uny.ac.id/upload/131808670/penelitian/ UNIT%20TRAINER%20PANEL%20KUBKEL%2020k V.pdf.

[6] Imam Sandi Taufiq, 2020. Analisis Koordinasi Proteksi 20 kV Saluran pengantar atau penyulang Feeder KLU 3. Teknik Elektro : Fakultas Teknik,Universitas Semarang, Semarang.

[7] Kelas Teknisi, 2023. Pemutus Tenaga (PMT) atau Circuit Breaker. Oniline (https://www.kelasteknisi.com), diaksess 19 Desember 2023.

[8] I. M. Ibrahim et al., “Web server performance improvement using dynamic load balancing techniques: A review,” system, vol. 19, p. 21, 2021.

[9] Lutfi Lastiko Wibowo, 2011. Transformator Arus Dan Pemeliharaan Transformator Arus Pada Pt. Pln (Persero) P3b Region Jawa Tengah & Diy Upt Semarang Gis 150kv Simpang Lima. Semarang: Fakultas Teknik Universitas Diponegoro, Online. https://adoc.pub/transformator-arus-dan pemeliharaan-transformatorarus-pada-.html, diakses 19 Desember 2023.

[10] PT PLN (Persero) No. 0520-2.K/DIR/2014. Buku

Pedoman Pemeliharaan Pemutus Tenaga. Jakarta.

PT.PLN (Persero), 2014. Buku Pedoman Kubikel Tegangan Menengah. Jakarta: https://www.slideshare.net/slideshow/bukupedoman kubikeltegangan-menengah/119542463, diakses 16 Juli 2024