Performance Evaluation of 3x1 MW Mini Hydro Power Plant in Malili District, East Luwu Regency
Abstract
One form of simple renewable energy that is widely used is water energy (hydro power). one form of water energy utilization is the MiniHydro power plant,. MHP was chosen as an alternative energy because it has several advantages over other power plants, such as being environmentally friendly, more durable, smaller operating costs and suitable for remote areas. The purpose of this research is to evaluate the performance of the plant in terms of continuity of service and analyze the factors that affect the continuity of service of the plant and analyze the level of reliability of the plant based on the value of energy availability produced by the MHP. the methods in this research are literature study, observation, data collection and processing. Based on the results of the study, it is known that the electrical energy produced by the Ussu Malili MHP for one year (2023) amounted to 16,439,486 kWh and the resulting energy efficiency reached 67%. The resulting operating time is 81%, maintenance time reaches 3.9%, and disruption time is 21%, while the reliability of the power system based on the availability of energy at the Ussu Malili MHP is 79%.References
[1] Abdul, F., Pintowantoro, S., Setiyorini, Y., Rochiem, R., & Dewi, D. S. (2017). Pembuatan Pembangkit Listrik Tenaga Mikrohidro (PLTMH) sebagai Pendukung Utama Peternakan Kambing di Dusun Laharpang Desa Puncu Kabupaten Kediri. Sewagati, 1(1), 35-44.
[2] Anggraini, F. R., Juwono, P. T., & Suhartanto, E. (2018). Studi potensi Pembangkit Listrik Tenaga Mini Hidro (PLTM) Desa Kepil, Kabupaten Wonosobo, Jawa Tengah. Jurnal Mahasiswa Jurusan Teknik Pengairan, 1(2), 14.
[3] Gumilang, A. P. (2018). Penilaian Keandalan Sistem Tenaga Listrik Jawa Bagian Timur Dan Bali Menggunakan Formula Analitis Deduksi Dan Sensitivitas Analitis Dari Expected Energy Not Served. Jurnal Teknik ITS, 7(1), B1-B6.
[4] Hafiz, A. R., Nuramal, A., & Supardi, N. I. (2022). Analisis Produksi Listrik Di Pembangkit Listrik Tenaga Minihidro (PLTM). Rekayasa Mekanika, 6(1), 15-21.
[5] Ihsan, M. (2022). Perancangan pembangkit Listrik Tenaga Mikro Hidro (PLTMH) Turbin Whirlpoll Skala Prototype
[6] Lumbantoruan, E. (2017). Studi Pembangkit Listrik Tenaga Air (PLTA) Sigura-gura Pt. Inalum Power Plant.
[7] Lukas, L., Rohi, D., & Tumbelaka, H. H. (2017). Studi kinerja pembangkit listrik tenaga air (plta) di daerah aliran sungai (das) brantas. Jurnal Teknik Elektro, 10(1), 17-23.
[8] M. Manno, “Energy Systems course Lecture notes Hydraulic Turbines and Hydroelectric Power Plants Hydraulic Turbines and Hydroelectric Power Plants,” 2013.
[9] Maryeni, A., & Nisdja, I. Studi Analisa Daya Yang Tersalurkan Oleh PLTM Sangir Hulu Lubuk Gadang Solok Selatan. Abstract Of Undergraduate Research, Faculty Of Idustrial Technology, Bung Hatta University, 20(1), 4-4.
[10] Prasetyo, Z. T. E., & Pane, Z. (2013). Studi Proteksi Pada Pembangkit Listrik Tenaga Minihidro (PLTM) Silau 2 Tonduhan Kabupaten Simalungun. Singuda ENSIKOM, 2(3), 113-118.
[11] Pardamean, H. (2019). Studi Analisis Pengaruh Perubahan Beban Terhadap Efisiensi Transformator Daya Di Plta Pt. Wampu Electric Power (Wep)
[12] Rahmah, A. (2018). Evaluasi Kinerja Pembangkit Listrik Tenaga Minihidro Bungin Kecamatan Bungin Kabupaten Enrekang Provinsi Sulawesi Selatan (Doctoral dissertation, Politeknik Negeri Ujung Pandang)
[13] Sintong, A. H. (2017). Desain Pembangkit Listrik Tenaga Air Kapasitas 5kW di Desa Sianbu-Riau. Riau: Universitas Riau..
[14] Subekti, R. A. (2015). Studi Kelayakan Pengembangan Pembangkit Listrik Tenaga Minihidro di Desa Sukamaju Kabupaten Garut Jawa Barat. Jurnal Teknik Hidraulik, 6(2), 105-116
Downloads
Published
Issue
Section
License

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.