Analysis of Improvement of Distribution Substation Earthing Resistance Values at PT. PLN (Persero) ULP Karebosi
DOI:
https://doi.org/10.31963/elekterika.v21i2.5099Keywords:
Earthing resistance, Distribution substation, Multiple Grounding Rod, Panampu Feeder, MATLABAbstract
The grounding system at the distribution substation is an essential component closely related to maintaining the reliability of the electrical system. In this regard, this study aims to examine the impact of applying certain grounding methods to improve grounding resistance values at the distribution substation. The research was conducted over five months, from January 15, 2024, to June 15, 2024, at the Pannampu feeder managed by ULP Karebosi. MATLAB GUI was used to theoretically calculate using the Dwight equation related to grounding resistance (Ω) and soil resistivity (Ωm). The results of this study show that the measured grounding resistance values after applying the multiple grounding rod method decreased by 52.49% for the grounding electrode of the lightning arrester GD. KPPKU, 49.45% for the grounding electrode of the transformer body and PHB-TR GD. KPPKU, and 48.94% for the grounding electrode of the lightning arrester GD. KPPDK, which had grounding resistance values of 5.43Ω, 5.44Ω, and 8.42Ω before reconfiguration.References
[1] Haz, Fauzia dan Muhammad Ilhammawardi. 2024. Sistem Pentanahan Driven Ground Pada Gardu Distribusi ULP Soreang. EPSILON: Journal of Electrical Engineering and Information Technology, XXII (1): 34.
[2] Sapada, Zairah dkk. 2017. Mitigasi Gangguan Transformator 60 MVA GI Panakkukang. Seminar Nasional Teknik Elektro dan Informatika (SNTEI) 2017. 32. Makassar: Jurusan Teknik Elektro, Politeknik Negeri Ujung Pandang.
[3] PT PLN. 2010. Buku 4 Standar Konstruksi Gardu Distribusi dan Gardu Hubung Tenaga Listrik. Jakarta.
[4] Tanjung, Abrar. 2015. Analisis Sistem Pentanahan Transformator Distribusi di Universitas Lancang Kuning Pekanbaru. Jurnal Sains, Teknologi, dan Industri, XII (2): 294.
[5] Kodoti, Krestofel A dkk. 2015. Analisa Perkiraan Umur Transformator. Dalam E-Jurnal Teknik Elektro dan Komputer, 36.
[6] Yusa, Mochammad dan Joko Dwi Santoso. 2020. Deteksi Dini Gangguan Pembatas Arus Listrik Pada PHB-TR Bertegangan Tinggi Broadcast SMS Gateway. Dalam Jurnal Pseudocode, VII (2): 144.
[7] Rumonondor, I Israel dkk. 2022. Analisa Sistem Pentanahan pada Trafo Distribusi di Universitas Sam Ratulangi. UNSTAR Repository, 2.
[8] Widiarto, Eko dkk. 2023. Perbaikan Nilai Impedansi Pembumian Metode Driven Ground pada Tower Tegangan Tinggi Dengan Penambahan Batang Elektroda (Braching) dan Cocopeat. Dalam Jurnal Orbith, XIX (2): 177.
[9] Yuniarti, Erliza, dan Eliza. 2015. Pengaruh Penambahan GYPSUM Dalam Mereduksi Nilai Resistansi Pentanahan di Tanah Ladang. Dalam Jurnal Berkala Teknik, V (1): 770.
[10] Badan Standardisasi Nasional. 2000. Persyaratan Umum Instalasi Listrik 2000 (PUIL 2000). Jakarta.
[11] Putra, D Eka dan Fitra Angga. 2018. Studi Sistem Pentanahan 150 kV Lubuk Linggau – Pekalongan PT. PLN (Persero) Unit Pembangkit dan Transmisi (UPT) Bengkulu. Dalam Jurnal Surya Energy, III (1): 220.
[12] Ghani, Abdul. 2013. Pengaruh Penambahan Gypsum terhadap Nilai Tahanan Pentanahan pada Sistem Pentanahan. Laporan Akhir Teknik Elektro Universitas Andalas. Padang.
[13] Idris, A Rosyid dkk. 2021. Analisis Pengaruh Pemasangan Counterpoise pada Tower Saluran Udara Tegangan Tinggi 70kV Line Mandai-Pangkep. Prosiding Seminar Nasional Teknik Elektro dan Informatika (SNTEI) 2021. 107. Makassar: Jurusan Teknik Elektro, Politeknik Negeri Ujung Pandang.
[14] Hutauruk, T.S. 1991. Pengetanahan Netral Sistem Tenaga Dan Pengetanahan Peralatan. Yayasan PUIL. Jakarta : Erlangga
[15] Manik, M G Putra dkk. 2023. Studi Pemeliharaan dan Perbaikan Sistem Pembumian Gardu Distribusi SL.212 PT PLN (Persero) Unit Layanan Pelanggan Sunggal. Konferensi Nasional Social dan Engineering Politeknik Negeri Medan. Medan.