Analisis Penentuan Letak Trafo Distribusi Pada Penyulang Walmas Menggunakan ETAP Power Station 12.6.0
DOI:
https://doi.org/10.31963/elekterika.v20i1.4502Keywords:
Transformer, Loading, Voltage DropAbstract
Distribution transformers are devices designed to transmit electrical energy from the power source to consumers. The loading percentage on distribution transformers must not exceed the health index standard of 80% of their capacity, in accordance with the regulations of PT.PLN (Persero) as stated in directorate circular Number: 0017.E/DIR/2014. In addition to the loading percentage, the voltage variation in electrical distribution must comply with the specified limits of +5% and -10% from the nominal voltage as per SPLN No.1 of 1995. This research was conducted to analyze one of the distribution transformers that experienced overload, leading to a voltage drop in the electrical network system, necessitating appropriate measures to address the issue. The load forecasting for determining the capacity and lifespan of transformers is conducted using the Least Square method. Data from 2022 shows that the distribution transformer with the code "gardu 610.OK," with a capacity of 100 kV in the Walmas feeder at PT. PLN (Persero) ULP Palopo Kota, experienced an excessive load of up to 85.67%, resulting in a voltage drop of up to 18.2%. The research findings indicate that the installation of an additional transformer can reduce the loading percentage to 52.95% and improve the voltage drop percentage to 4.9% in the first quarter of 2023.References
Arpah & Muhammad Andhi. 2020. Analisis Penambahan Trafo Sisipan pada Penyulang ULP Mattoanging. Makkassar: Universitas Muhammadiyah Makkassar.
Akbar Rahmat. 2016. Analisa Jatuh Tegangan jaringan Distribusi Primer 20 kV pada Penyulang Indrapuri. Banda Aceh: Universitas Syah Kuala
Handayani, F. I., Yuningtyastuti. 2016. Analisis Jatuh Tegangan dan Rugi Daya pada Jaringan Tegangan Rendah Menggunakan Software ETAP 12.6.0. Semarang: Universitas Diponegoro.
Nugroho, Agung. 2015. Analisa Perbaikan Losses dan Jatuh Tegangan pada Jaringan Sambungan Rumah Tidak Standar dengan Simulasi Software ETAP 7.5.0. Semarang: Universitas Diponegoro
Partanoan, Harahap. 2019. Analisa Penambahan Trafo Sisip Sisi Distribusi 20 Kv Mengurangi Beban Overload Dan Jatuh Tegangan Pada Trafo B1 11 Rayon Tanah Jawa Dengan Simulasi ETAP 12.6.0. Medan: Universitas Muhammadiyah Sumatera Utara.
Petruzella, Frank D. 2001. Elektronik Industri. Yogyakarta: Andi Publisher.
Ratno Wibowo, Winayu Siswanto. 2010. Buku 1 Kriteria Enjinering Konstruksi Jaringan Distribusi Tenaga Listrik. Jakarta.
Ratno Wibowo, Winayu Siswanto. 2010. Buku 3 Standar Konstruksi Jaringan Tegangan Rendah Tenaga Listrik. Jakarta.
Ratno Wibowo, Winayu Siswanto. 2010. Buku 4 Standar Konstruksi Gardu Distribusi Dan Gardu Hubung Tenaga Listrik. Jakarta.
Safitri, Fajar Dwi. 2020. Simulasi Penempatan Trafo pada Jaringan Distribusi Berdasarkan Jatuh Tegangan Menggunakan ETAP POWER STATION 12.6.0. Semarang: Universitas Negeri Semarang
SPLN, 1. 1995. Tegangan - Tegangan Standar. Jakarta.
Suhadi. 2008. Teknik Distribusi Tenaga Listrik Untuk Sekolah Menengah Kejuruan Jilid 1. Direktorat Pembinaan Sekolah Menengah Kejuruan.
Suswanto, Daman. 2009. Sistem Distribusi Tenaga Listrik. Padang.
Syarifuddin, A. Noor. 2012. Bahan Ajar Mesin Arus Searah Dan Trafo. Makassar: Politeknisk Negeri Ujung Pandang.
Syufrijal dan Readysal Monantun. 2014. Jaringan Distribusi Tenaga Listrik. Jakarta: Kementerian Pendidikan Dasar Menengah Dan Kebudayaan Republik Indonesia
Widodo, Joko. 2008. Ramalan Penjualan Sepeda Motor Honda pada Cv Roda Mitra Lestari. Depok: Universitas Gunadarma