Analisis Sistem Koordinasi Proteksi Over Current Relay (Ocr) Dan Ground Fault Relay (Gfr) Tegangan 20 Kv Bay Trafo Pada Gardu Induk Sanga-Sanga Kalimantan Timur

Authors

  • Sarma Thaha Politeknik Negeri Ujung Pandang
  • Andi Wawan Indrawan Politeknik Negeri Ujung Pandang
  • Yosua Januarius Pongkiding Politeknik Negeri Ujung Pandang

DOI:

https://doi.org/10.31963/elekterika.v6i2.3527

Abstract

As a provider of electricity services, PLN is required to provide service and supply of electricity with good quality, continuity, improvement and efficiency. Disturbances in distribution systems are short circuit faults between phases or ground phase faults. To protect properly, proper coordination of relay settings is required. Among the equipment in the protection system used in distribution lines are overcurrent relays (OCR) and ground fault relays (GFR). In this study, an analysis of the OCR and GFR settings will be carried out on a 20 kV cubicle at the Sanga-Sanga Substation, East Kalimantan, with the help of the DigSILENT Power Factory 15.1.7 application with a disturbance simulation at 10% and 90% of the feeder length. Based on the analysis results, it is obtained that the short circuit results of 3 phases, 2 phases, and 1 phase to the ground have a value that is not much different from the calculation, while the OCR setting for the outgoing relay is 0.8 A on the secondary side. TMS is 0.083 seconds while the relay is on the incoming side of 20 kV 1 A and TMS of 0.198 seconds. The GFR setting for the outgoing relay is 0.06 A on the secondary side, and TMS is 0.1 seconds, and the relay on the incoming side is 20 kV 0.015 A and TMS is 0.26 seconds).

Author Biographies

Sarma Thaha, Politeknik Negeri Ujung Pandang

Teknik Elektro

Andi Wawan Indrawan, Politeknik Negeri Ujung Pandang

Teknik Elektro

Yosua Januarius Pongkiding, Politeknik Negeri Ujung Pandang

Teknik Elektro

References

Irfan Affandi.2009.Sistem Pengaman Relai Arus Lebih (Overcurrent Relay) Dan GFR Sebagai Proteksi Trafo Pada Gi 30 Kv di http://lib.ui.ac.id/ (akses pada 29 November 2020)

Tanyadji, I. S., & ST., M. S. (2015). Sistem Proteksi Tenaga Listrik. Makassar: Penerbit Ininnawa.

Edinta S. Ronika. 2014. "Perhitungan Kedip Tegangan Akibat Gangguan Hubung Singkat Pada Penyulang UNIB Sistem Distribusi PLN Bengkulu’’. Teknik elektro, Universitas Bengkulu

[Stevenson, William D. 1994. Analisa Sistem Tenaga Listrik, Edisi Keempat. Diterjemahkan oleh : Idris. Ir. Kamal.Jakarta: Erlangga

Rachmat Hidayat Mastian Noor.2017.Analisis Koordinasi Over Current Relay Untuk Gangguan Phasa Dan Tanah Di Pt.Kpc (Kaltim Prima Coal).di http://eprints.itn.ac.id/ (akses pada 18 November 2020 )

PT. PLN (Persero). Proteksi dan Kontrol Transformator. Jakarta: PT. PLN (Persero)

Djiteng,M.(2015).Operasi Sistem Tenaga Listrik Edisi Ketiga.Jakarta: Graha Ilmu

Downloads

Published

2022-11-30