Kendali Sistem Tegangan Baterai Peralatan 20 kV PT PLN Bontang

Authors

  • Abdul Zain STITEK BONTANG KALTIM

DOI:

https://doi.org/10.31963/elekterika.v6i1.2807

Keywords:

Baterai, Sistem Proteksi, Arduino Nano, Aplikasi Blynk

Abstract

The protection system is essential in the 20 kV distribution network system. The 20 kV equipment control system is supplied from 2 sources: PT (Potential Transformer) and DC voltage supply (Battery). If the protection relay and mechanics do not get a DC voltage supply, it will have an impact on the equipment not being able to trip when there is a disturbance in the network. There is no DC voltage supply due to battery failure or damage. For this reason, it is necessary to operate the tool manually, which results in the normalization process taking longer because it takes time and long distances, so the duration of outages is even greater. In this study, a monitoring system for the battery of the equipment will be made where previously observations were made about the need for this tool. The method used by the tool uses the blynk application as a receiver of direct voltage and temperature measurement reports that are connected to the gsm module. As a microcontroller processes, Arduino Nano commands from intelligent phones, generating a measurement report from the battery. GSM SIM 900 module as a data receiver and sender in the system. This tool is easy to apply to the system because it does not require a sufficient additional voltage source from the battery. The results of this study become a solution for companies to improve their 20 kV. distribution network system. 

Author Biography

Abdul Zain, STITEK BONTANG KALTIM

Teknik elektro

References

Setiadi, A. (2014). Topologi dan Pola Penanganan Permukiman Kumuh di Kota Bontang. Tata Loka.

Mochammad Rismansyah, Refdinal Nazir. Pengaturan Keseimbangan Pengisian dan Pengosongan Baterai Asam Timbal. JNTE, Juli 2016. Vol 5, No 2

Abdul Zain & Hari Susanto, Perancangan Sistem Informasi Monitoring Pembelian Material (studikasus :k5-project IKPT Toyo). INTEK, April 2017. Vol.4 (1), 27-33.

Fayyadl, M. (2011). Rekonfigurasi Jaringan Distribusi Daya Listrik dengan Metode Algoritma Genetika. Transmisi. https://doi.org/10.12777/TRANSMISI.8.2.76-83.

Ali Basrah Pulungan, Sukardi, Dahlan Prinando Tambun. Keandalan Jaringan Tegangan Menengah 20 kV di Wilayah APJ Padang PT.PLN (Persero) Cabang Padang. JNTE, September 2012. Vol 1, No 1:

Firdausi, Mega. 2015. Analisis Koordinasi Relay Arus Lebih dan Penutup Balik Otomatis (Recloser) pada Penyulang Junrejo 20 kV Gardu Induk Singkaling Akibat Gangguan Arus Hubung Singkat. Tugas Akhir. Universitas Brawijaya. Malang

Alief P. B. S, Dedet C. R, dan Heri S. 2013. Monitoring Kinerja Baterai Berbasis Timbal untuk Sistem Photovoltaic, Jurusan Teknik Elektro, ITS. Surabaya.

Cecep Mauludin, Suganhi, Ika Sudarmaja, D. (2014). Sistem Supply AC/DC. In Pedoman Pemeliharaan Sistem Supply AC/DC.

Hermono, I. H., Rusdinar, A., Ph, D., & Ramdhani, M. (2015). Security car system based gps and sms. Ng of Applied Science

Downloads

Published

2022-05-30

Issue

Section

Cover