IMPLEMENTASI CATU DAYA TAMBAHAN (CDT) PADA MASJID AN NUR BLOK 1 PERUMNAS ANTANG MAKASSAR
Abstract
Masjid An nur blok 1 Perumnas Antang Makassar, 3 times the sound system has been lost. The aound system lost at thenight and pln off. This incident is the reason so we feel called to provide solutions to the incident with attach additionalpower suplay.The propossed power source is to install solar cells. The stages of activity are 1). Pre paration (determine the capacity of the solar cells, batteries, BCR, Inverter,etc and determine lay out each component),2)Implementation or Execution (installation of the component solar cells), 3). Evaluation and socialization.Thispower suplay has given a sense of comport for the community, especially the congregation of the masjid an nur in themonth of ramadhan 1440 H when pln electricity broke up.Downloads